« View Portfolio
Park Avenue, NYC: Design-Build for Replacement of Viaduct

Gedeon GRC Consulting, as a Sub-consultant, provided traffic engineering and roadway design support services for the Park Avenue Viaduct (PAV) Phase 1 from Bent 21 to Bent 53 between the north side of East 115th Street and the south side of East 123rd Street along Park Avenue in Harlem, NY.

The project consisted of replacement or repair of major segments of the Park Avenue Viaduct. The project focuses on the elevated steel structure that carries four tracks along Park Avenue between East 110th Street and the Harlem River Lift Bridge.

No items found.

All Metro-North trains along the Hudson, Harlem, and New Haven lines must travel on the Park Avenue Viaduct to get in and out of Grand Central Terminal. On a typical weekday, approximately 750 trains and hundreds of thousands of customers travel across the viaduct. Nearly half of the viaduct was constructed in the 1890s.

Our scope of work includes traffic analyses, simulation study, WZTC, temporary and permanent traffic signals, temporary and permanent lighting, pavement markings, signage, roadway design support, and construction support services.

FEATURED Projects
Project Details
Client:
MTA Construction & Development and Metro-North Railroad
Budget:
$590,000,000
Location:
Manhattan, NY
Markets:
Design-Build
Highway/Roadway
Rail/Transit