Manhattan Tunnel Project: A Design-Build Milestone in Hudson River Connectivity

Gedeon GRC Consulting is proud to contribute engineering expertise to the Manhattan Tunnel Project, a pivotal segment of the larger Hudson Tunnel Project. This high-impact infrastructure effort is designed to enhance regional connectivity by linking HYCC-3 to the Hudson River tunnel through twin tunnels beneath 12th Avenue. A key feature of the project includes a massive access shaft engineered to retrieve tunnel boring machines, underscoring the scale and complexity of the work.

Scope of Services:

As part of the Design-Build team, Gedeon GRC is delivering comprehensive engineering services across multiple disciplines:

  • Utilities, Drainage & Site Work
  • Traffic Signals, Signage & Pavement Markings
  • Roadway Pavement & Restoration
  • Maintenance & Protection of Traffic (MPT)
  • Lighting & Safety Systems

These services are critical to ensuring safe, efficient, and minimally disruptive construction in a dense urban environment. Our team is applying precision design and coordination to meet aggressive timelines and maintain public safety throughout the build.

No items found.

Construction commenced in early 2025 and is advancing rapidly. As of September 5, 2025, the site reflects significant progress, with active excavation and infrastructure installation underway. The pace of development highlights the effectiveness of the Design-Build delivery model and the collaboration among project stakeholders.

Gedeon GRC remains committed to supporting the successful delivery of this transformative project. We look forward to continued progress and to contributing engineering solutions that will serve New York’s transit infrastructure for decades to come.

FEATURED Projects
Project Details
Client:
Gateway Development Commission (GDC)
Budget:
$1.2B
Location:
The City of New York - Manhattan
Markets:
Tunnel